AIG · Oasis Indoor Environmental · Team

Team and Tasks for the 12-Month Approach

A small team. Spencer stays the inspector and the final signature. AIG does the public footprint and the drafts. A coordinator is added only if discovery shows the week cannot absorb a recurring promise.

Expected roles

Oasis · already in the business

Spencer Hampy, President

Owns client judgment, scope, and price. Approves every public claim and signs every report. Supplies job history, sample reports, listing logins, and the managing-agent introductions. Does not write the website or run the ad accounts. Time spent here should replace phone triage later, not add a second job on top of field work.

AIG · months 1–12

Engagement lead

Runs the two-to-four-week discovery, keeps the sequence in order, and stops work that would promise hours Spencer does not have. Single point of contact for status. Foundation listings and website fixes stay ahead of any portal build.

AIG · months 1–3, then light upkeep

Listings and Google Business Profile

One name, address, and phone. Correct category, hours, and services. Retire or correct the HomeGuide remediation listing. Set the post-job review request. Yelp stays the current reputation until Google reviews exist. HomeAdvisor is not the lead proof.

AIG · months 1–6

Website, SEO, AEO, and GEO

Service pages for mold, lead, asbestos, odors and VOCs, allergens, and water. A request path that does not return to the homepage. Remove leftover cleaning copy. Later: property-manager pages, two or three case studies, and short answers a search or AI result can quote without calling Oasis a remediator. Spencer reviews voice before publish.

AIG drafts · Spencer approves · months 4–6

Offer and sales kit

Named offer for managing agents and co-op boards, a one-page leave-behind, and a management-summary template that sits on the technical report. No fee and no response-time promise until Spencer sets them. Case studies use jobs he approves, with building names removed.

Oasis · only if discovery says the week requires it

Coordinator

Phone triage, scheduling, intake chase, and the review request after a job closes. This seat is not assumed. It is the condition for selling a recurring response. If the week map shows Spencer can still absorb the current call volume, this role waits.

Oasis · confirm before assigning work

Robert and field support

Do not assign report or field tasks to Robert until Spencer confirms he is on staff and which jobs he covers. Certifications are printed only after they are confirmed current. The old public ACAC link no longer resolves, so it is not reused.

AIG configures · Spencer signs · months 7–12

Building Record and intake

A configured portal for two or three pilot buildings: documents, open items, and complaint intake. An intake form in front of the phone. Draft reports from Spencer’s notes and lab format. Nothing sends itself. No building-health score. Access split by client and role. Custom software waits until the pilots are actually used.

Tasks by tier

WhenTaskOwner
Weeks 1–4Discovery: job history, three managing-agent conversations, map of Spencer’s week, fee decision.Engagement lead with Spencer
Weeks 1–4Listing access, single NAP, Google category and hours, HomeGuide correction.Listings, with Spencer’s logins
Months 1–3Website service pages, working request path, cleaning copy removed.Website, Spencer reviews
Months 1–3Post-job review request for Google and Yelp. Confirm certifications before they are featured.Listings and Spencer
Months 4–6Named offer, one-page kit, management-summary template, two or three case studies, answer blocks for co-op boards and Local Law 55 support.Offer kit and website; Spencer sets price and approves claims
Months 4–6Decide whether the coordinator seat is required before any recurring promise is sold.Spencer and engagement lead
Months 7–12Building Record for named pilot buildings, intake form, draft reports Spencer signs, short training for supers and managing agents, referral tracking that does not depend on HomeAdvisor.Building Record with Spencer

Prepared by Accurate Information Group · October 22, 2026. · Oasis workspace